Yu Long, Leader of the Blackwater Crew Boss 攻略:位置、招式与打法
The leader of the Blackwater Crew located in Northwest Lake near the Lion Dance Hall Bell and opposite the Green Serpent House in Pungjin/Pangzhen. He utilizes water blas
Yu Long, Leader of the Blackwater Crew(Boss) — The leader of the Blackwater Crew located in Northwest Lake near the Lion Dance Hall Bell and opposite the Green Serpent House in Pungjin/Pangzhen. He utilizes water blasts, hazardous arena bubbles, and spinning trident attacks, and drops items used to clear fire-blocked paths upon defeat.
基础信息
| Field | Value |
|---|---|
| 区域 | Pangzhen |
| 位置 | Lake Northwest near Lion Dance Hall Bell, opposite Green Serpent House, Pungjin (near a broken bridge in the water filled with water and lanterns, accessed from Lion Dance Hall / Trail's Heart) |
| 奖励 | Yu Long Stalwart, Yu Long's Deluge (Deluge Phantom Edge used to get through fire-blocked paths) |
打法技巧
- Dodge away from his water blast and never step into the bubbles on the arena floor or you lose health.
- After his spinning trident attacks comes a red flash water attack—perfect dodge it and then punish him.
- Make your way past the broken bridge, water, and lanterns across the water near the Lion Dance Hall to find and defeat him.
深度攻略
涵盖本条目的完整视频攻略:
来源与验证
本页每个字段均有来源引用,并经人工审核后发布。
相关指南
Aberrant Three-Faced Puppet Boss 攻略:位置、招式与打法
A fast and slippery hidden boss located near the shrine close to the lady's rift bell. Due to its incredible speed, players should avoid trading hits and instead wait for
Acolyte Guhe Boss 攻略:位置、招式与打法
An acolyte boss in the Meigu Village East Dock island of Meigu Lake who casts poison orbs.
Acolyte Lei Ting Boss 攻略:位置、招式与打法
An acolyte boss located in Punji southern part near the lake scarecrow.
Acolyte Yan Ru Boss 攻略:位置、招式与打法
Acolyte Yan Ru (also known as Acolyte Yen Ru) is a main boss located in the Village of Liu near the Engine Giant Remains and the scarecrow east of Terraces Field. She is